We're doing a pool remodel and would like to add a baja shelf/sun ledge. I didn't realize there were so many different methods to build the ledge. Our pool is 20x40 and we wanted our ledge to be 9x8 in the shallow end. It would be approximately 3 ft tall. Our contractor said there are 3 options:
1. Use cinder blocks to build the wall (with rebar). Fill the ledge with our old concrete coping (smashed up). Cover with 6 inches of concrete on top.
2. Build wall using concrete mold (with rebar). Fill the ledge with gravel or our old concrete coping. Cover with concrete on top.
3. Build rebar cage. Fill with concrete.
Can you share your thoughts on these options? Thank you!