If they won't do it, could you reduce the depth of the deep end to compensate, or is there a "rule" for that too?

Depends if he wants it to be a "Diving" pool.

There are standards for depths and slopes of diving pools.
 
All the walls are now in my garage.

My kids didn’t know of the pool plans until the material started to arrive. We kept it a surprise.

My 4 year old “can we swim tomorrow?” :D

Ran into a few issues when unpacking and doing inventory check.

Liner track is two different colors and textures of grey. Also a portion is scratched. IMG_9758.jpeg

Also, the cantilever coping forms are two different profiles.

IMG_9760.jpeg
IMG_9773.jpegIMG_9774.jpeg
 
I submitted the One Call with PA today. Looking like dig day is 5/31/2024. I am renting a machine for a day, and they let you keep it for the weekend and still only charge you a day rate. My FIL has a bobcat skid steer to help move the dug up dirt out of the way. A coworker let me borrow his laser transit. All coming together!
 
Dig day over the weekend. Hole is in! We ran into a ton of rock in the deep end and had to rent the jackhammer attachment for the excavator. All the shale made the tapered portion of the hopper not perfect, but we can fix that later.

Now I need to get rid of the dirt. It looks like a bomb went off.

Pool Dig 2.jpgPool Dig.jpg
 
  • Love
Reactions: newdude
Congrats! This is the one thing we hired a contractor for. The dirt went straight into dump trucks and the site was left spotless afterwards. Plus they did an incredibly accurate job, although we have very sandy soil here so not as challenging. It was definitely worth every penny we paid.
 
  • Like
Reactions: Skelly_GSR
I got all the walls up finally. It was a little nerve racking getting the final few wall sections set. I started in 1 corners and went both ways, I was nervous it either wasn't going to bolt up or all my distances were off. Thankfully everything is good.

I don't know if Royal ordered me too few A-frame braces, or I used them too closely together. Either way, I had to order 4 more. I would rather have more bracing than less I suppose. I placed the order on Monday this week, and they have still yet to ship.

Next steps are to get the last few A-frames installed and rough-in the main drain. Then I can get ready for the concrete collar.
Pool Walls Complete.jpg


My supervisor overseeing production:

Pickles.jpg
 
  • Love
Reactions: newdude