Today was go live day on my Stenner pump and tank. Everything is installed and running.
As Phase 1 I am just running a wifi timer to turn on and off the pump. Phase 2 I’ll wire in 110 to the aqua link relay and control from there. This gets me going for now.
Since I was theoretical opening the pool today I ran a full check:
FC:3ppm
pH: 7.8
CYA: 50
TA: 70
CH: 450
I went ahead and manually added chlorine to get to my target of 5. Tomorrow and the next few days I’ll recheck after it has pumped in chlorine to see if I am running it long enough to maintain. If not I’ll bump up the run times.

As Phase 1 I am just running a wifi timer to turn on and off the pump. Phase 2 I’ll wire in 110 to the aqua link relay and control from there. This gets me going for now.
Since I was theoretical opening the pool today I ran a full check:
FC:3ppm
pH: 7.8
CYA: 50
TA: 70
CH: 450
I went ahead and manually added chlorine to get to my target of 5. Tomorrow and the next few days I’ll recheck after it has pumped in chlorine to see if I am running it long enough to maintain. If not I’ll bump up the run times.
