I’m having my liner replaced but the installer can’t measure for the new liner until the water is clear. Pool was BLACK 10 days ago. I SLAMMED everyday for a week and got it to neon green but still opaque. Then Hurricane Ian came through and we lost power for 2 days and now its heading back to darker green. I can’t do this anymore. I’m spending a Crud load of money on bleach and I need to get this liner ordered pronto! It there a “nuclear” option that I can deploy using other chemicals? Since this water will be drained out before the new liner we’ll never swim in it, and I’m not worried about damaging/staining the old liner. (But obviously don’t want to use anything that would damage my equipment.). Any ideas?