Wow! That's really cool!Looking good! They are getting close to pouring the bond beam. Those full length liner over steps have a million nuts and bolts. I did full width liner over sun deck/steps and there were literally 20 bags of nuts and bolts. I did not think I would ever get them all in.
You can get a idea of how many from this pic. There is a bolt like every 4 inches or so, rows and rows of them!
View attachment 325073