I just purchased the CircuPool RJ -60. I'm so excited!
I have two intermatic timers. One is for the pump and heater and runs off 240. The other timer is 110 and is for the Polaris booster pump which I no longer use (I recently bought a robot making the booster pump moot). The problem is that the wires from one box flows through the other box... including some wires that just pass through both boxes to the spa blower.
Ideally, I wanted to install the SWG to the main intermatic timer that controls the pump, but all four of the knock out holes are in use. Could I just cut another hole in the main timer?
I know that I could use the other timer as my SWG can be set to use 240 or 110. I'm afraid of instances where the time of one timer doesn't match the other... and I've had intermittent issues with the trippers falling off the dial.
The good news is that everything is plumbed and no longer leaks (I forgot to put in the two gaskets, oops)!
I have two intermatic timers. One is for the pump and heater and runs off 240. The other timer is 110 and is for the Polaris booster pump which I no longer use (I recently bought a robot making the booster pump moot). The problem is that the wires from one box flows through the other box... including some wires that just pass through both boxes to the spa blower.
Ideally, I wanted to install the SWG to the main intermatic timer that controls the pump, but all four of the knock out holes are in use. Could I just cut another hole in the main timer?
I know that I could use the other timer as my SWG can be set to use 240 or 110. I'm afraid of instances where the time of one timer doesn't match the other... and I've had intermittent issues with the trippers falling off the dial.
The good news is that everything is plumbed and no longer leaks (I forgot to put in the two gaskets, oops)!