Recent content by Zaffor

  1. Z

    New pool build in South Florida .. finally! [Tons of pics]

    I see you went with concrete and tile. Same as I did. I didnt want to deal with the weeds and sagging pavers. Added cost but less hassle in the future.
  2. Z

    New pool build in South Florida .. finally! [Tons of pics]

    Your WAYY closer than I am. Mine has about 30" of water (It was empty last Thursday). I empty it often but its hard to keep up now, this amount of rain is insane. My dog was swimming in it last night. I do have rain gutters getting installed Friday!
  3. Z

    New pool build in South Florida .. finally! [Tons of pics]

    Finish that thing already!!! Might be full already with all this rain we have been getting.
  4. Z

    New pool build in South Florida .. finally! [Tons of pics]

    yeah the view is nice on that lake!
  5. Z

    Our First Pool

    concrete deck completed!!
  6. Z

    Our First Pool

    Kim they are required for the larger steel on the footers (borders) and are installed. The mesh gets pulled up as they pour and walk over it.
  7. Z

    Our First Pool

    Ready for inspection prior to pouring cement deck
  8. Z

    Our First Pool

    Backfill finished and they hauled away the mountains on dirt. Looks way better now.
  9. Z

    Our First Pool

    Roy Those look like Wago connections, i love those things!
  10. Z

    Our First Pool

    Heya Roy We are using microbrites 2 spa 4 pool and 2 on the tanning ledge Figured smaller with better spread would look good Also wanted one light to illuminate the shallow area where the floating steps cross and that had to be a small light. the bubblers use globrites and the laminars and...
  11. Z

    Our First Pool

    Backfilling and pouring the deck so they can hawl away the extra fill and start to work on the coping. When equipment arrives we can finish the conduit work on the side of the house
  12. Z

    Our First Pool

    Here are some photos after I started to backfill with sand. I had my wife spray lots of water down as we were backfilling to fill in all the voids.
  13. Z

    Our First Pool

    following my friend John & Ron’s experience, i wanted to terminate all the low voltage runs in one junction box. I sourced this stainless nema4 box and had knockouts cut into it for all 16 runs. This will then feed into the transformers after. i have 3 bubblers, 2 laminars, 1 led sheer, 6 pool...
  14. Z

    Our First Pool

  15. Z

    Our First Pool