    Thanks! Yes, we went in yesterday. No idea what the temperature was, but it was perfect! Gotta love AZ and swimming in October! Start-up is tomorrow and pool orientation this coming Saturday.
  2. F

    New Pool Build in Chandler AZ

    Time to update the thread. While we waited for more work to be done by the PB, we tackled the landscaping. I rented a trencher and spent the better part of a weekend doing the irrigation system. Changed out the 4 zone controller to a 6 zone controller, built a valve manifold, wired everything...
  3. F

    New Pool Build in Chandler AZ

    Thanks everyone! The tile does look really cool in the horizontal position on the table. There are some leftovers that we're going to see if the plaster company will set on the steps. Pre-plaster inspection with the city is set for Friday. Getting so close now :)
  4. F

    New Pool Build in Chandler AZ

    Time for some bling! Water line and table top tile got installed today. I got home from work after the sun was already going down, but got to see tons of different shades from different angles. We love how it came out and think this tile really makes the pool extraordinary! Can't wait to see...
  5. F

    New Pool Build in Chandler AZ

    Wanted to post some pictures and get an update on here. We cured the pool up until Sunday 9/4. The crew was set to come back out to start working on the travertine and stone install on Tuesday 9/6 after Labor Day. We ended up getting rain, just a light sprinkle for most of the morning, but it...
  6. F

    New Pool Build in Chandler AZ

    I'm not sure what paint they use, but I'll see if I can find out next time the project manager is on site.
  7. F

    New Pool Build in Chandler AZ

    They paint the pipes as part of their standard practice. It's very common here in AZ with all the pool builders.
  8. F

    New Pool Build in Chandler AZ

    Yep, we're certainly bonding. Got its 4th watering this morning.
  9. F

    New Pool Build in Chandler AZ

    Finally had shotcrete done today! We initially didn't get cleared on the pre-shotcrete inspection because the plumbing wasn't holding pressure. So that got fixed on the 25th, then the city came back out for inspection on the 26th. Shotcrete was then pushed to Monday the 29th. We were super...
  10. F

    New Pool Build in Chandler AZ

    Lol, ours was done right the first time ;)
  11. F

    New Pool in Arizona

    What a coincidence, we chose the same waterline tile! I'm sure once they are cleaned up the metallic streaks will really pop. Looking good so far!
  12. F

    New Pool Build in Chandler AZ

    8/22/16 Update Emailed PB regarding the missing steel on the 5 bar bond beam at 7:20AM. Site supervisor showed up at 7:45AM as I was leaving for work and confirmed that the bond beam was not complete. They've rescheduled the steel guys to come back out tomorrow to complete the work. This begs...
  13. F

    New Pool Build in Chandler AZ

    I'd say this is more like a light mocha color. We opted for this one since it was smoother and a lot less porous than the level 1 travertine selections they had. I'm sure this honed finish will be more slippery, but the more porous ones get so dirty looking after awhile and change appearance...
  14. F

    A Deep Pool Build in Peoria, AZ -- finished, working on chem balance!

    I've been watching your build and jealous seeing how great it turned out! Loving the brilliance of that blue finish. We're going to start getting bids on the security fencing, would you mind PMing me a link to one of his ads on Craigslist or alternatively his contact number? Thanks!
  15. F

    New Pool Build in Chandler AZ

    Thanks for the comments KimKats. Will let you know what they say about the missing 2 bars to make up the 5 bar bond beam. Thanks grumpiebk. That's the curvature of the shelf and steps are what set this design apart. All others incorporated hard lines, and this was an idea that the designer...