Failed inspection, the builder put 5 ground wires for the grid around the pool, and the inspector wants 6. So they sent over 3 guys who chipped two big holes right through the wall looking for rebar. The inspector said "one whole side lacked a ground wire, and why did they put 5 wires spread on...