I was bored the other afternoon and decided to monkey with my solar installation. I bought all the pieces so I could test for leaks, so why not install it. I cut the 2" riser pipes, assembled the 2" quarter turn valve, 6" lenght of 2"pvc pipe then a 2" tee with a treaded 1/2 mpt. Placed one...