Pool frame/ grunite was completed, pavers around the pool 6 feet all 3 sides the. 5 feet out on one side. On the 5 foot side the pool company is adding a 10x10 pad with pavers also.
There advising me I might need footers installed to build the pad up too be flush with the pool deck. There saying that option B is to grade dirt in the area and pack it good enough so I don’t need a footer.
the down side of the footer for me
Is that we are already locked in a price and they are just now telling me this during the construction process, they want to charge $3800.00 for the footer.
so, install footer? Or risk it?
There advising me I might need footers installed to build the pad up too be flush with the pool deck. There saying that option B is to grade dirt in the area and pack it good enough so I don’t need a footer.
the down side of the footer for me
Is that we are already locked in a price and they are just now telling me this during the construction process, they want to charge $3800.00 for the footer.
so, install footer? Or risk it?