Hello! New guy here.
We put in a 30x15 AGP last fall and closed it immediately. I just opened it and used temporary connections to get the pool cleaned up and running, but I'm going forward with rigid PVC fittings and piping.
My question is, where do I need shutoffs, unions, or bypasses? It's a very simple pool, one skimmer and one return. Hayward pump/cartridge setup, and a Gulf Stream heat pump to be installed. I feel like i'm overthinking where I'll need unions and shutoffs, and Gulf Stream advertises using a 2" full flow heat exchanger which they claim eliminates the need to install a bypass.
How many/where do I need my valves??
Thanks!
We put in a 30x15 AGP last fall and closed it immediately. I just opened it and used temporary connections to get the pool cleaned up and running, but I'm going forward with rigid PVC fittings and piping.
My question is, where do I need shutoffs, unions, or bypasses? It's a very simple pool, one skimmer and one return. Hayward pump/cartridge setup, and a Gulf Stream heat pump to be installed. I feel like i'm overthinking where I'll need unions and shutoffs, and Gulf Stream advertises using a 2" full flow heat exchanger which they claim eliminates the need to install a bypass.
How many/where do I need my valves??
Thanks!