Re: Under Construction - Absolute DISASTER. Advice apprecia
I completely agree with Dave J. If it was poured concrete walls, than would no be a issue with the daking leaning on it ( deck sagging). 80% of the deck weight it's on solid ground, it most likely it will not tip down, like a seasaw motion, but it may crack as it ged older. I would recomend that at minimum, have the concrete deck cut off at least 2' back from pool , back fill it 5 " at time and compacted adding water as it goes up. Finished the 2' gap with paving blocks nicely. This option would be a remedy not to have to go to a lawsuit disput, which both sides endup loosing time, money, insted of relaxing and enjoing the pool. Right thing to do is replacing the decking on its entirely. Is any warrantee on the decking at all?