Those are 2 floor returns. Seems it is the new trend in pool builders in my area, all but one of the ones I talked with put them in in addition to the wall returns now. I was able to get close to what my ideal was. I had to put more than I liked at the shell stage but less at the deck. It ended up like this:A quick question or 2
I see you have a channel main drain set, but what are the 2 vertical PVC pipes coming up from the bottom of the pool? They look to be partial in deep end and the other in shallow end. Thanks.
Also, I was looking back at your very beginning of the thread and you had a proposed payment model. Where you able to obtain that or something close to it?
10% Contract Signing, 55% at shell stage, 20% at Deck and equipment, 10% After passing of Electrical final and plumbing final, and 5% After water is in it and it and does not leak. Lien releases with each payment if using subcontractors