Hello,
I’m trying to rewrite my pentair pump to the breaker box as the current wires have melted and caused a short. The wires currently are going from the motor to the clock and from the clock to the breaker 20amp double (this is the breaker box by the pool not the main)
Since I don’t use the clock, can I just run new wires straight from the pump motor to the breaker?
Any feed back is appreciated
I’m trying to rewrite my pentair pump to the breaker box as the current wires have melted and caused a short. The wires currently are going from the motor to the clock and from the clock to the breaker 20amp double (this is the breaker box by the pool not the main)
Since I don’t use the clock, can I just run new wires straight from the pump motor to the breaker?
Any feed back is appreciated