New Pool in Chandler, AZ

Exactly, elwood58, on the fridge. In AZ, when it's 110+ outside, the fridge is barely able to keep things slightly cool. I don't think there is anything worse then going for a cold beverage only to find it slightly cool! :)

Plus, the electricity to run a fridge in the summer, outdoors, in the direct sun would not make it worth it. We'll just have a nice big ice tub with drinks in it when entertaining.

The pool and spa are about 16,150 gallons total.

We could have done pavers on the patio, but they still wanted to charge $8.75 a sq foot. Not sure why. Plus, it would have raised the patio by almost 1.5" unless you break out the concrete and start fresh. The tile raised it by .5" and was $5.88 a sq ft. We also made the decision on the travertine tile at the last second, literally the day they were doing the pavers for the decking. By then, all of the other elevations had been set to be 1" above the patio. If we would have changed to pavers on the patio it would have actually been higher than the decking height which wouldn't have worked. In the end it turned out great.
 
I ended up making the beam of my pool level with my concrete patio so when we laid the pavers it would be level. How many sqft of pavers did you have? Looking at about 900 sqft on mine. My landscaper said 7sqft and my pool guy was at 8.50...
 
We had about 742 sq ft of pavers. At least that's what's in our contract. I think it was actually closer to 800 sq ft for the pavers. The coping was an additional 138 linear feet. For the tile we had 382 sq ft. So total for travertine coverage was 1320 sq ft.

Your bond beam is exactly level with your patio? They weren't concerned about sloping the decking down from the pool towards your patio so water would drain away from the pool?

If you look at some of my latest pictures, you can see a deck drain where the pavers meet the existing patio. They required this for any pavers that met an existing structure. The pavers slope down towards that drain and then my patio slopes down from the house towards that drain. I would suspect your patio also has a slope away from the house. Hopefully you won't have any problems with water running from the patio into the pool. :)
 
We passed our final inpsection today! Should be putting on the Pebble Plus finish some time this week.

They also hooked up the grill to the gas line and the painters will be by tomorrow morning to finish painting everything. Progress!

The only bad thing is that my gas company (Southwest Gas) can't come out for 2 weeks to put a new meter on the house and hook up the new gas line for the spa and grill. :( No grilling for Memorial Day.
 

Enjoying this content?

Support TFP with a donation.

Give Support
I am increasing the load on the gas line to accommodate an additional 466,000 BTU. I didn't know that they put new meters on either, but my pool builder recently told me I had to contact Southwest Gas myself to have a bigger meter put on once the final inspection was done. It turns out that they would have contacted me as soon as the final gas line inspection was sent to them.

I assume that when you add more load, the meter needs to increase in size to allow more gas to flow. That way if I am trying to use all my gas appliances at once I have enough flow.

Bryan
 
We had a pleasant surprise this morning at 6:30 am. The PebbleTech guys were here to finish the pool!

[attachment=2:q3s7jw75]IMG_1954.JPG[/attachment:q3s7jw75]
[attachment=1:q3s7jw75]IMG_1956.JPG[/attachment:q3s7jw75]
[attachment=0:q3s7jw75]IMG_1958.JPG[/attachment:q3s7jw75]
 

Attachments

  • IMG_1954.JPG
    IMG_1954.JPG
    170.1 KB · Views: 280
  • IMG_1956.JPG
    IMG_1956.JPG
    207.3 KB · Views: 279
  • IMG_1958.JPG
    IMG_1958.JPG
    247.5 KB · Views: 276
[attachment=2:1spi3i0w]IMG_1963.JPG[/attachment:1spi3i0w]
[attachment=1:1spi3i0w]IMG_1968.JPG[/attachment:1spi3i0w]
[attachment=0:1spi3i0w]IMG_1971.JPG[/attachment:1spi3i0w]
 

Attachments

  • IMG_1963.JPG
    IMG_1963.JPG
    228.7 KB · Views: 272
  • IMG_1968.JPG
    IMG_1968.JPG
    275.7 KB · Views: 273
  • IMG_1971.JPG
    IMG_1971.JPG
    239.3 KB · Views: 273
[attachment=2:3lgk3f2b]IMG_1974.JPG[/attachment:3lgk3f2b]
[attachment=1:3lgk3f2b]IMG_1982.JPG[/attachment:3lgk3f2b]
[attachment=0:3lgk3f2b]IMG_1983.JPG[/attachment:3lgk3f2b]
 

Attachments

  • IMG_1974.JPG
    IMG_1974.JPG
    244.4 KB · Views: 270
  • IMG_1982.JPG
    IMG_1982.JPG
    221.4 KB · Views: 271
  • IMG_1983.JPG
    IMG_1983.JPG
    269.5 KB · Views: 271
And their big slurry box that is now ready to overflow!
[attachment=0:2gmjxafq]IMG_1979.JPG[/attachment:2gmjxafq]

The painters are here now. Tomorrow is acid wash and then the fill! It all came together so quickly!
 

Attachments

  • IMG_1979.JPG
    IMG_1979.JPG
    233.5 KB · Views: 269
Acid wash is done and now we are filling!

They actually used a gas powered trimmer with a brush attached to it to scrub the floors. Pretty good idea!
[attachment=2:18vwpwrc]IMG_1987.JPG[/attachment:18vwpwrc]

There was a huge difference once the top layer was washed away.
[attachment=1:18vwpwrc]IMG_1990.JPG[/attachment:18vwpwrc]

Just about done.
[attachment=0:18vwpwrc]IMG_1991.JPG[/attachment:18vwpwrc]
 

Attachments

  • IMG_1987.JPG
    IMG_1987.JPG
    228.8 KB · Views: 232
  • IMG_1990.JPG
    IMG_1990.JPG
    233.5 KB · Views: 231
  • IMG_1991.JPG
    IMG_1991.JPG
    248.2 KB · Views: 230

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.