Pool is 8 weeks post renovation. Plumbing was not changed or updated and has been tested to hold pressure. The light conduit was not pressure tested and the leak detection company confirmed we are loosing 35gal/hr through the pool lights.
I've contacted my builder but they are being slow. Are there any ways to temporarily slow/stop the leaking niches without doing the builders job - I want them to come out and do the repacking of the light cord passthrough. Looking for more of a tape garbage bags over it kinda thing for now (I know chinsy, but I want them to fix it and don't want to give them a reason to say I did anything and therefore....)
Its been leaking like this since the day we refilled, shouldn't the builder have done a bucket test etc just to double check (its free afterall)?
Should I push for them to reimburse the cost of testing, the water bill (35000 gallons a month)?
Should I just be happy if they even come fix it....?
I've contacted my builder but they are being slow. Are there any ways to temporarily slow/stop the leaking niches without doing the builders job - I want them to come out and do the repacking of the light cord passthrough. Looking for more of a tape garbage bags over it kinda thing for now (I know chinsy, but I want them to fix it and don't want to give them a reason to say I did anything and therefore....)
Its been leaking like this since the day we refilled, shouldn't the builder have done a bucket test etc just to double check (its free afterall)?
Should I push for them to reimburse the cost of testing, the water bill (35000 gallons a month)?
Should I just be happy if they even come fix it....?