MJWORTHY,
As far as we know that is still the target date. Weather has not been our friend, there is over 860,000 lbs. of shotcrete so far between the retaining walls, pool and catch basin. Developing the elevation changes and putting in the forms for them took some time. And to be honest, the PB could have been more diligent in their ordering of materials and scheduling. They are doing a quality job so far, so we will be patient.
As far as we know that is still the target date. Weather has not been our friend, there is over 860,000 lbs. of shotcrete so far between the retaining walls, pool and catch basin. Developing the elevation changes and putting in the forms for them took some time. And to be honest, the PB could have been more diligent in their ordering of materials and scheduling. They are doing a quality job so far, so we will be patient.