Depth question. We were going to go 3 to 5 to 3.5 on other side.
Thoughts/suggestions? To shallow? Bad slope?
Not doing slide now, but want to in future. Do I have them plumb for it now? Does it require plumbing/water?
Thoughts/suggestions? To shallow? Bad slope?
Not doing slide now, but want to in future. Do I have them plumb for it now? Does it require plumbing/water?