the new lateral assebly is in, 300lbs of new sand and a new O Ring for the multiport valve.
I used Lube Tube on the new O Ring, lined up everything and turned it on.
I have a huge leak around the flange clamp.
The clamp is already screwed tight but it's not pulling the valve housing down...