- Jul 31, 2010
- 95
TFP Team:
I completed the install of my circupool rj45. Everything looks good, but i realized after i had finished that i didn't follow the directions exactly.
In the following picture from the manual, it shows the cell barrel unions should run into at least a six inch length of straight pipe, and those "uprights" should go into the 90 elbows. Unfortunately, i missed this part and ran the barrel unions from the cell directly into the elbows.
Should i rework the install to add the straight uprights? Or can i stop worrying about the oversight? Everything seems to be working just fine, i have the "fog" going into the return, salt is normal, etc.
Thanks in advance for your help.
I completed the install of my circupool rj45. Everything looks good, but i realized after i had finished that i didn't follow the directions exactly.
In the following picture from the manual, it shows the cell barrel unions should run into at least a six inch length of straight pipe, and those "uprights" should go into the 90 elbows. Unfortunately, i missed this part and ran the barrel unions from the cell directly into the elbows.

Should i rework the install to add the straight uprights? Or can i stop worrying about the oversight? Everything seems to be working just fine, i have the "fog" going into the return, salt is normal, etc.
Thanks in advance for your help.