Pool was recently replastered with prism matrix pebble finish. We’re 2.5 weeks out.
Im balancing my chemicals and needed about 25 lbs of calcium chloride to get my Ca hardness to 250 ppm (40k gallon freshwater pool).
Welp, I didn’t exactly read all instructions and added all 25 lbs. I premixed it all and added it (took about an hour!). Only after did I notice that you apparently aren’t supposed to add more than 10 lbs in a given 24 hour period.
So ive added 2.5x the normal recommended time. This is the first time Ive done this so it’s not something that has repeatedly happened over time.
So did I screw up really badly? Possible permenant damage?
here are the current readings:
pH: 8 (treated with HCL so haven’t measured since this was added)
TA: 90
FC: 0 (chlorine added as well - haven’t measured since it’s been added)
CYA: 20
CH: 250
Im balancing my chemicals and needed about 25 lbs of calcium chloride to get my Ca hardness to 250 ppm (40k gallon freshwater pool).
Welp, I didn’t exactly read all instructions and added all 25 lbs. I premixed it all and added it (took about an hour!). Only after did I notice that you apparently aren’t supposed to add more than 10 lbs in a given 24 hour period.
So ive added 2.5x the normal recommended time. This is the first time Ive done this so it’s not something that has repeatedly happened over time.
So did I screw up really badly? Possible permenant damage?
here are the current readings:
pH: 8 (treated with HCL so haven’t measured since this was added)
TA: 90
FC: 0 (chlorine added as well - haven’t measured since it’s been added)
CYA: 20
CH: 250