- Jul 9, 2011
- 89
Is there any reason I cannot have my concrete deck poured this fall and then do the floor and the liner in the spring? My 20 x 40 steel wall pool is backfilled and I could have it graded for the concrete in a week or so. The advantage to me is savings in the off season for concrete work. We have been having 60 degree days and maybe if it was warm enough I could put in the liner but I didn't want to get stuck and I rather do that on a much warmer spring day.
Thanks