Hi- I'm back
Moved (left lagoon style pool behind) and just finished building 40k+gal beach entry pool. We used the quartzite tiles to blend in the beach entry and raised bond beam area. Didn't realize there would be a seepage problem with the grout until pool filled. I don't like the way it looks and complained to PB. He said we can wait till after swim season and we can drain it down some to seal the grout then. Does this sound like a good idea, and would it effect the pebbletec being dried out for few days? Thank you for any input! Here's couple of pix of the problem.