we just signed the contract on our pool build. Our yard is very small so the pool will pretty much take up the whole yard (which is good because I really dislike yard maintenance. Would definitely like help making sure things look good during construction
17X35, 3.5-5-4 ft deep (want more of a sport pool).
Spa is 7x7
hayward 400k btu heater
Hayward 2hp 2 spd pump
Wireless remote system
Quartz
Polaris 280
3 deck jets
2 LED lights
1 LED spa light
We are going for a modern look.
They are building the patio roof as well which wont be white, but will be a metal roof (grey). The columns will be leuders (limestone) part of the way then thick beams. The patio floor is concrete with cooldeck to match the color of the pavers which will be a grey leuders. The coping will be cantilevered leuders and the planters will all be leuders as well. Between the pavers will be some kind of black rock. We impervious cover restrictions so we are extremely limited in how much decking we can put down. Pavers dont count as impervious cover so we are mostly using pavers.
They are digging through solid limestone.
Total cost is 63K which is 30K less than the most expensive bid and 20K more than the least expensive bid.
Will be showing pictures to get your expert feedback on how you think it is going.
They have said that the dig will take 3-5 days, shotcrete a few days later.
17X35, 3.5-5-4 ft deep (want more of a sport pool).
Spa is 7x7
hayward 400k btu heater
Hayward 2hp 2 spd pump
Wireless remote system
Quartz
Polaris 280
3 deck jets
2 LED lights
1 LED spa light
We are going for a modern look.
They are building the patio roof as well which wont be white, but will be a metal roof (grey). The columns will be leuders (limestone) part of the way then thick beams. The patio floor is concrete with cooldeck to match the color of the pavers which will be a grey leuders. The coping will be cantilevered leuders and the planters will all be leuders as well. Between the pavers will be some kind of black rock. We impervious cover restrictions so we are extremely limited in how much decking we can put down. Pavers dont count as impervious cover so we are mostly using pavers.
They are digging through solid limestone.
Total cost is 63K which is 30K less than the most expensive bid and 20K more than the least expensive bid.
Will be showing pictures to get your expert feedback on how you think it is going.
They have said that the dig will take 3-5 days, shotcrete a few days later.