I have always heard from industry (construction) professionals that there is a minimum wait time for the concrete to properly dry before applying acrylic topping; that being a total of 5 consecutive dry days. The pool builder poured the concrete during rainfalls, and then topped it 2 days after the last rainfall.
Should I be worried about future quality issues with the deck?
Should I be worried about future quality issues with the deck?