2 weeks into our pool start up and have a few questions now that the pool isn't showing sings of plaster dust and the water is balanced appropriately.
I will be introducing salt into the pool in about 2 weeks and get the SWG cell started.
As it stands now the Intelliflo 4x160 pump has been running 24/7 for the past 2 weeks. 2 speeds have been programmed into the SunTouch Controller. Low = 1750rpm and High = 3450rpm. Low is approx 70gpm and I think high is approx 140 gpm. This would give me a pool water turnover of about 3.36hrs on Low and 1.6hrs on High.
Any advice on scheduling pump running times with this info? I am not sure if I want to run on Low for 7 hours or on High for 3 hours to get the water to turn 2 times per day.
I am thinking on Low for a longer period to give the SWG time to do what it needs to do.
I will be introducing salt into the pool in about 2 weeks and get the SWG cell started.
As it stands now the Intelliflo 4x160 pump has been running 24/7 for the past 2 weeks. 2 speeds have been programmed into the SunTouch Controller. Low = 1750rpm and High = 3450rpm. Low is approx 70gpm and I think high is approx 140 gpm. This would give me a pool water turnover of about 3.36hrs on Low and 1.6hrs on High.
Any advice on scheduling pump running times with this info? I am not sure if I want to run on Low for 7 hours or on High for 3 hours to get the water to turn 2 times per day.
I am thinking on Low for a longer period to give the SWG time to do what it needs to do.