I had some repair work done on my pool that required it to be emptied, ARGS!
I'll tell you it is amazing how deep the pool looks when it is empty, and those steps are tall!
So I'm going to be filling the thing on Saturday when the tile is finished and was wondering about the best way to do it?
My fill water has a CH of 200, TA of 200 so I already get to deal with the TA!
Here are the numbers I'm shooting for:
FC 4
TA 100
PH 7.8
Borates 50
CYA 70
So I need:
912 oz of Borax or 12 76oz boxes
1 gallon of 6% bleach
865 oz of MA (6.75 gallons) - added in doses with aeration in between.
144 oz of CYA (9 lbs)
That sound right?
Should I fill it, then add stuff or add as it is filling? I can't imagine how long it is going to take to fill, but I'll probably use two hose bibs to fill it. Hopefully not much more than a day.
Suggestions?
I'll tell you it is amazing how deep the pool looks when it is empty, and those steps are tall!
So I'm going to be filling the thing on Saturday when the tile is finished and was wondering about the best way to do it?
My fill water has a CH of 200, TA of 200 so I already get to deal with the TA!
Here are the numbers I'm shooting for:
FC 4
TA 100
PH 7.8
Borates 50
CYA 70
So I need:
912 oz of Borax or 12 76oz boxes
1 gallon of 6% bleach
865 oz of MA (6.75 gallons) - added in doses with aeration in between.
144 oz of CYA (9 lbs)
That sound right?
Should I fill it, then add stuff or add as it is filling? I can't imagine how long it is going to take to fill, but I'll probably use two hose bibs to fill it. Hopefully not much more than a day.
Suggestions?