I think its a little weird how the labor AND materials to add a bench around my entire shallow end is less than the labor to set the single row of tiles. Also not going to do the booster pump.
I was wondering about the mastic/sealer between the coping and pool deck. If I plan on replacing the pool deck with pavers in the next year or two what should I do about this?
I was wondering about the mastic/sealer between the coping and pool deck. If I plan on replacing the pool deck with pavers in the next year or two what should I do about this?