Company showed up today and OF COURSE.... it was raining. :grrrr: (see my build thread - rained all the time) Luckily it had just stopped. They had to wait an hour for the roof to dry up. They must have worked an hour. Took 5 cigarette breaks and a couple of texting breaks then told me they have to go back to the shop to get the 1/4 panels to fit around one of my vents. Oh - after they take a lunch break.
Here is what they accomplished so far.
They arrive and sit waiting for the roof to dry. This is also a common picture for their many breaks.
Connections to equipment
Pipe running up house. Not in the best place but once I paint it, it will look a little better.
Panels on the roof
rain cloud leaves the area
They left an hour and a half ago for lunch. I'm hoping they are picking up the panels they need while they're out.
Post more when they are done. (which may be tomorrow)
Alan
Here is what they accomplished so far.
They arrive and sit waiting for the roof to dry. This is also a common picture for their many breaks.
Connections to equipment
Pipe running up house. Not in the best place but once I paint it, it will look a little better.
Panels on the roof
rain cloud leaves the area
They left an hour and a half ago for lunch. I'm hoping they are picking up the panels they need while they're out.
Post more when they are done. (which may be tomorrow)
Alan