My husband and I had our gardener level our non-sodded space. Then my husband and I dug out paver holes, leveled them and placed the pavers -- lot's of hard work and we're going through a heat wave. Did I mention we are elderly? Anyway, some of the pavers were a 1/8 inch to 1/2 inch off and we decided to go ahead and set up the pool. Pool is about half full and we see there is 1 3/4" difference between the high side and low side. We are now draining the pool. When the pool is empty we will break it down, fold it up and remove it. We will remove the two Gorilla Pads, the tarp and the 16 concrete pavers. Then we will have a slightly more compressed site with a circle of 16 one inch paver holes. Any ideas on the easiest way to get the ground level from this point? Thanks!