We are a couple of days, due to scheduling, away from shooting gunite and I have discovered an issue or problem. The channel main drain is in place with rebar going over the plumbing run across the bottom and up the wall. First problem my Pool Engineering report says main drain plumbing will not be within the shell. Second problem is with a 90 on the bottom of the channel drain and the rebar, there is no way the gunite can be more than 4" thick at the bottom of the deep end (8'). Not good, IMHO. I will post pics this morning.
Anyone have any ideas or suggestions, other than tearing it all out and doing it right? Thanks