I bought a 20ft round Excursion from Leslie's pool. Top of their line ($7.000.00) I hired a man to install the pool for me ($1,250.00) as I have a 14 inch dig on one side to level the pool. He started today and everything is looking good. He is using all the right equipment to level the blocks. Due to the fact you are not able to get any machinery in my back yard he is forced to dig and level the blocks and bottom rail by hand.
Here is my problem. It looks like he will have the blocks and rail level but the center will not be level. there are high and low spots from the hand tools used to dig it to level. He is telling me that he will use sand to make the bottom of the pool level. If you have a good base for your blocks and they are level along with the bottom rain is it smart to use sand to level the bottom inside of the pool?
They are back at 7:00am to finish up and I'm worried sick
Here is my problem. It looks like he will have the blocks and rail level but the center will not be level. there are high and low spots from the hand tools used to dig it to level. He is telling me that he will use sand to make the bottom of the pool level. If you have a good base for your blocks and they are level along with the bottom rain is it smart to use sand to level the bottom inside of the pool?
They are back at 7:00am to finish up and I'm worried sick