So I'm at least 3 weeks out before I get water in my new pool. I tested my water from the hose and the results are as follows:
PH-6.8
CL-0
TA-80
CH-60
I have few questions- 1. Do I wait for a complete fill before starting with chemicals?
2. Does temperature of water matter as far as absorption?
3. Two weeks after my pool is full I have to leave for a week, will setting my swg to keep things
in check for the week that I'm gone work for that long? This is my first swg, not sure if it
in essence works like a cholrinator?
Thanks again!
PH-6.8
CL-0
TA-80
CH-60
I have few questions- 1. Do I wait for a complete fill before starting with chemicals?
2. Does temperature of water matter as far as absorption?
3. Two weeks after my pool is full I have to leave for a week, will setting my swg to keep things
in check for the week that I'm gone work for that long? This is my first swg, not sure if it
in essence works like a cholrinator?
Thanks again!