So, I was thinking about this and decided to see what you guys thought.
If you were to use the trichlor pucks (in a floater) to maintain chlorine and use bleach to 'fine tune'/shock the pool. How much water would you need to replace a month (week?) to keep CYA levels in check? I know it could be a wide range, depending on the size of the pool and other chemical levels.
Assuming that all other levels remain at/near goal levels, could this scenario work?
If you were to use the trichlor pucks (in a floater) to maintain chlorine and use bleach to 'fine tune'/shock the pool. How much water would you need to replace a month (week?) to keep CYA levels in check? I know it could be a wide range, depending on the size of the pool and other chemical levels.
Assuming that all other levels remain at/near goal levels, could this scenario work?