- Apr 24, 2013
- 90
the installers will have to dig down appr 3 foot on one side of pool. so i will be going down 3 foot tapering out to nothing on the sides. i plan on backfilling about 8-12 inches up on pool and tapering back the slope so there will be no drop offs to collapse and then putting down a tarp or landscape fabric over this it will also be coverd by a deck what do you guys think?