So we finally are able to do what we have been wanting to do for a while now, build a pool! We are currently in the building process and are at the stage where the decking and waterline tile have been completed. The next steps are stacked stone and plastering (Pebble Sheen) the pool. They will also be finishing the BBQ grill and putting travertine tile on the patio. We hope to be done in 2-3 weeks.
All equipment is Hayward.
Variable speed 2HP pump
60 sq ft DE filter
400K BTU natural gas heater
ProLogic 8 with aquapod
Salt Chlorine Generator system
Paramount O3 Ozone system (I know everyone's feelings on this, but it won't hurt anything to have it other than my wallet)
White LED lights (not sure of brand)
about 15k gallons for pool, 1k for spa
Waveforce cleaning system (not in-floor)
Travertine pavers for the deck
Here is the final design we came up with.
[attachment=2:3i8re6eg]Acevedo r4_012.jpg[/attachment:3i8re6eg]
[attachment=1:3i8re6eg]Acevedo r4_015.jpg[/attachment:3i8re6eg]
[attachment=0:3i8re6eg]Acevedo r4_020.jpg[/attachment:3i8re6eg]
More construction pics to follow.
All equipment is Hayward.
Variable speed 2HP pump
60 sq ft DE filter
400K BTU natural gas heater
ProLogic 8 with aquapod
Salt Chlorine Generator system
Paramount O3 Ozone system (I know everyone's feelings on this, but it won't hurt anything to have it other than my wallet)
White LED lights (not sure of brand)
about 15k gallons for pool, 1k for spa
Waveforce cleaning system (not in-floor)
Travertine pavers for the deck
Here is the final design we came up with.
[attachment=2:3i8re6eg]Acevedo r4_012.jpg[/attachment:3i8re6eg]
[attachment=1:3i8re6eg]Acevedo r4_015.jpg[/attachment:3i8re6eg]
[attachment=0:3i8re6eg]Acevedo r4_020.jpg[/attachment:3i8re6eg]
More construction pics to follow.