Hi all. Great info and shared experiences in this forum. However I am still in need of some advise.
My pool construction begins May 20th. We are building:
34x16 liner over steel with SWCG system.
My question is in regards to the concrete decking... How long should I wait before having this work done post completion of pool construction? My PB says we can do it immediately but I know folks that have waited as much as a year. I would like to use the pool this summer but considering what I am spending, I would prefer to not be hasty and cause myself issues and $$$ down the line.
I was thinking more like 30 days but I would like any thought. We are in central mass and the earth in that area is certainly a mixture of dirt and clay. I say this with certainty as I am currently building a new great room and garage addition and have a few major holes with footings poured and can see the layers of dirt and clay. Not even sure if that matters....
Thank you.
My pool construction begins May 20th. We are building:
34x16 liner over steel with SWCG system.
My question is in regards to the concrete decking... How long should I wait before having this work done post completion of pool construction? My PB says we can do it immediately but I know folks that have waited as much as a year. I would like to use the pool this summer but considering what I am spending, I would prefer to not be hasty and cause myself issues and $$$ down the line.
I was thinking more like 30 days but I would like any thought. We are in central mass and the earth in that area is certainly a mixture of dirt and clay. I say this with certainty as I am currently building a new great room and garage addition and have a few major holes with footings poured and can see the layers of dirt and clay. Not even sure if that matters....
Thank you.