I'm thinking of adding Autopilot SWG this spring. Current equipment (pump/heater) wired 220v to Intermatic T101R timer box. Relatively straight-forward deal. With respect to electrical, where would the Autopilot fit in to this scheme? The manual indicates provisions for wiring to external timer by connectiong to LOAD OUT terminals in timer box but won't this mean that when timer is in OFF condition the Autopilot will have no power to it as well? Don't I want the Autopilot to be 'always on'? Additionally, with pump AND heater already wired to the LOAD OUT of the timer box, is the addition of Autopilot as 3rd LOAD OUT component OK?
I'm just trying to grasp the concept, not that I'd actually do it myself w/ no assistance; I hate electricity.
I'm just trying to grasp the concept, not that I'd actually do it myself w/ no assistance; I hate electricity.