Hello everyone.
I am in the process of opening my pool.
My numbers are as follows:
PH: 7.2
TA: 90
FC: 10
CC: .5
CH: 350
Cya: 10?
I am using the TF-100 kit and the water in the cya tube is all the way to the top and I can barely see the dot. I know I need to add stabilizer and have it ready to go. I am in the process of shocking right now. Should I finish this process and add the stabilizer after I'm done or should I do it now? If I do it now, and since cya levels take a week to show up, at what point are my levels considered changed for the shocking purposes and daily FC levels? (in other words...when do I start using the higher ppm level of chlorine according to the cya/chlorine chart ?)
Thanks in advance.
I am in the process of opening my pool.
My numbers are as follows:
PH: 7.2
TA: 90
FC: 10
CC: .5
CH: 350
Cya: 10?
I am using the TF-100 kit and the water in the cya tube is all the way to the top and I can barely see the dot. I know I need to add stabilizer and have it ready to go. I am in the process of shocking right now. Should I finish this process and add the stabilizer after I'm done or should I do it now? If I do it now, and since cya levels take a week to show up, at what point are my levels considered changed for the shocking purposes and daily FC levels? (in other words...when do I start using the higher ppm level of chlorine according to the cya/chlorine chart ?)
Thanks in advance.