The PB has given me the option of keeping the excavated dirt to be rough graded around the pool area, or having it taken away for an added cost. The pool site is already pretty decent as far as being level with my surrounding slabs and patio, so I don't think I will need a lot of dirt to level the surrounding area out. I also know they don't use this dirt to backfill around the pool. The fill dirt around here is filled with chunks of wood and clay.
Would it be a better idea to have the PB haul it away and then bring in river sand to grade the surrounding area?
Any opinions are appreciated.
Would it be a better idea to have the PB haul it away and then bring in river sand to grade the surrounding area?
Any opinions are appreciated.