- Apr 24, 2011
- 10
We just finished having our pool replastered and are still waiting for the Aquarite system to get here (40K) and had read that we needed to dissolve all the salt into the pool prior to turning on the Aquarite system.
We were getting ready to purchase some salt and then read where we should wait 10-14 days before adding salt on a replaster to allow for the plaster to cure. We are filling the pool now with well water (started day of plastering) and am
wondering what we should do to the water for the next few weeks while we allow the plaster to cure more.
Should we put in some chlorine in the mean time? Will this need to be drained out and refilled to convert over the salt when that time arrives?
Any input or advice?
The pool is a freeform design and we are timing how long it takes to fill with 2 hoses and then want to time how long it takes to fill a 5 gallon bucket with water to try to compute just how much water the pool holds, any better ideas on how to calc the volume?
Thanks,
Phil
We were getting ready to purchase some salt and then read where we should wait 10-14 days before adding salt on a replaster to allow for the plaster to cure. We are filling the pool now with well water (started day of plastering) and am
wondering what we should do to the water for the next few weeks while we allow the plaster to cure more.
Should we put in some chlorine in the mean time? Will this need to be drained out and refilled to convert over the salt when that time arrives?
Any input or advice?
The pool is a freeform design and we are timing how long it takes to fill with 2 hoses and then want to time how long it takes to fill a 5 gallon bucket with water to try to compute just how much water the pool holds, any better ideas on how to calc the volume?
Thanks,
Phil