I am looking to install a 30' AGP this spring. I was going to do it last year, but I had a backhoe pull out some tree stumps that were in the way. I wanted to let that ground firm up over the winter. My backyard has a very high water table, and I believe that if I dig down far enough to get solid ground, then the pool will be sitting in water for much of the year. I was thinking to dig down to undisturbed soil, and then have someone come out with grade 5 or something to build it back up. Do any of you see a problem with this? If not, what kind of contractor should I call ... a landscaping company? This location is my only option, and my wife will murder me in my sleep if the pool isn't running this year.