First, Thanks for all your help on previous posts. I promise to make this the last help post I make during construction.
I posted before about the grading issues my PB and Concrete guy has left me with. Neither will take ownership of it, so I am stuck trying to figure it out myself. I've attached a picture of my situation. The PB has evelated the pool a couple of feet to allow for proper drainage, which has left a 2 1/2 foot drop from the edge of the dirt to the ground. This was going to be my access into the pool but now its a steep grade.
Are there any suggestions?
I posted before about the grading issues my PB and Concrete guy has left me with. Neither will take ownership of it, so I am stuck trying to figure it out myself. I've attached a picture of my situation. The PB has evelated the pool a couple of feet to allow for proper drainage, which has left a 2 1/2 foot drop from the edge of the dirt to the ground. This was going to be my access into the pool but now its a steep grade.