I lost the handle a couple of weeks ago due to my stupidity.
This is my plan:
My robot will be here on Wed and my CYA was 90.
Over the weekend I replaced about 20% of 33.5K gal but have not got my new CYA yet. The pool calc suggest a drop from 90 to 70 but will check before I attack.
Prior to the water change my PH was 8.4.
Does a water change usually effect ph?
I am under the impression that before adding the bleach I need to have my ph at the 7.2-7.4 range.
I will then go to shock level and hold it there until I have no drop in overnight FC
All the while filtering and roboting the pool.
Does this look like a goop plan.
I still have a couple more inches of water to add
This is my plan:
My robot will be here on Wed and my CYA was 90.
Over the weekend I replaced about 20% of 33.5K gal but have not got my new CYA yet. The pool calc suggest a drop from 90 to 70 but will check before I attack.
Prior to the water change my PH was 8.4.
Does a water change usually effect ph?
I am under the impression that before adding the bleach I need to have my ph at the 7.2-7.4 range.
I will then go to shock level and hold it there until I have no drop in overnight FC
All the while filtering and roboting the pool.
Does this look like a goop plan.
I still have a couple more inches of water to add