Our pool is currently being built and should be ready to fill in the next 2-3 weeks. The pool is ~28,000 gallon IG vinyl pool. We aren't planning to use it this year but I assume the builder will fill it to normal level to test everything before lowering the water for winter. Are we better off trucking in water or just using the hose? Is trucked water pre-treated/cleaner or is it essentially the same as town water? Should I order a test kit now and test my tap water even though we'll be closing it right after they're done?
In terms of cost we're on town water but don't pay for sewer so the cost to fill would only be about $350 using the hose vs about $900 for 3 truckloads.
In terms of cost we're on town water but don't pay for sewer so the cost to fill would only be about $350 using the hose vs about $900 for 3 truckloads.