I just drained all but about 3 or 4 feet of the deep end to polish the horrible stonescapes finish we had put on (bad application, not product) and have a few water questions. I've never drained and started with new water before and am wondering if theres a way to guess at the stabilizer I'll need. I'm guessing I'll be adding about 25000G of new water which will be at zero. I've found a few calculators, but I'm not sure I"m using them right. Also, is liquid stabilizer worth the extra cost for this scenario if I want to get the water set up quickly?
When our pool was remodeled, they came and dumped in the quart-sized bottles of Jack's Blue Stuff and they said they swear by it for a startup. I wasn't paying for it seperately, so there was no incentive to sell me on it. Anybody have good/bad experience with that stuff?
I know I need to post test results, which I'll do, but I'm out of everything but pH and chlorine tests. I'll get those and try to get some numbers.
When our pool was remodeled, they came and dumped in the quart-sized bottles of Jack's Blue Stuff and they said they swear by it for a startup. I wasn't paying for it seperately, so there was no incentive to sell me on it. Anybody have good/bad experience with that stuff?
I know I need to post test results, which I'll do, but I'm out of everything but pH and chlorine tests. I'll get those and try to get some numbers.