All right all, I've been reading/educating myself on the forum here for several weeks. We just started excavation yesterday at 3:00 pm. I was amazed my PB could get a crew at that time of day on a friday! At 6:45 am this morning my Iron guys were already here followed by the plumber stubbing in. In a mire 20 hours we are ready for gunite. Thus far we have had a clean dig and plan on shooting Monday. My PB actually has been trying to get them out yet today!
I look forward to tips, and suggestions. I would love to post pics along the way, but I'm not sure the best way to do this. I'm not too techy, and the sit FAQ's are a little confusing on attaching images. Until I figure it out I'll just keep typing. I'm doing an IG, Gunite, SWG, all Hayward with a 400k heater, oh it's 97 diam. 3 bubblers and 2 sprayers, auto fill and overflow.
Thanks in advance
I look forward to tips, and suggestions. I would love to post pics along the way, but I'm not sure the best way to do this. I'm not too techy, and the sit FAQ's are a little confusing on attaching images. Until I figure it out I'll just keep typing. I'm doing an IG, Gunite, SWG, all Hayward with a 400k heater, oh it's 97 diam. 3 bubblers and 2 sprayers, auto fill and overflow.
Thanks in advance