Hello. We just started a new build in MA yesterday 18 X 36 permacrete, with full width stair. Just looking for the opinion of the members on pouring the deck after the liner and water goes in. I want to get the pool in and wrapped up before winter and let the area settle on one corner we have a 5' lift or filled area. So I am looking to have that settle before we have the concrete or paver done. I have the option of waiting until spring for the pool to be finished but, do want it dragged out over winter with an open hole, with no liner etc. the installer is concerned about installing the liner with out a debris free deck installed. Has any one done the deck after the pool?
Also anyone have expedience with Techo block installed Cost?
Thank you
Also anyone have expedience with Techo block installed Cost?
Thank you