So I got my first electric bill $300+. That was for a month after new plaster and I was running the pump ALOT, 24/7 for the first week.
I called Jandy and they told me my pump will do the following:
600 RPM - 30GPM
1500 RPM- 70GPM
1700 RPM- 90GPM
My pool is 10,690 gallons.
So, turnover is as follows:
600 RPM = 6.1 hours for 1 turnover
1500 RPM= 2.6 hours for 1 turnover
1700 RPM= 2 hours for 1 turnover
I have 3" suction lines and 2" return lines.
I have been running the pump @ 1725RPM for 12 hours per day so I am turning the entire pool 6+ times per day. Too much? I was thinking I could drop it down to say 1100 RPM and get like 4 hours per turnover and run it 8 hours per day for 2 turn overs per day. Sound right?
Will the SWG work at 1100 RPM? Not running salt yet
I called Jandy and they told me my pump will do the following:
600 RPM - 30GPM
1500 RPM- 70GPM
1700 RPM- 90GPM
My pool is 10,690 gallons.
So, turnover is as follows:
600 RPM = 6.1 hours for 1 turnover
1500 RPM= 2.6 hours for 1 turnover
1700 RPM= 2 hours for 1 turnover
I have 3" suction lines and 2" return lines.
I have been running the pump @ 1725RPM for 12 hours per day so I am turning the entire pool 6+ times per day. Too much? I was thinking I could drop it down to say 1100 RPM and get like 4 hours per turnover and run it 8 hours per day for 2 turn overs per day. Sound right?
Will the SWG work at 1100 RPM? Not running salt yet